Choose from , , , and

  • - Includes lines each time you run the job. In other words, you decide the counting interval for the counting group.

  • - Includes lines for the period in the counting journal when the period interval has expired.

    Suppose that you specified a period of 14 days. Counting takes place on January 1st, or 1/1, where lines are generated for the period. If the job is started on January 5th (1/5), then 14 days have not passed, and therefore no lines are generated in the journal for that period interval. If you start the job again on January 15th (1/15), lines are generated for the period in the journal, since 14 days have passed.

  • - If on-hand inventory reaches zero (0), lines are generated in the counting journal when the job is run. If the on-hand inventory reaches 0 after a count, lines are generated the next time you start the count.

  • - Inserts lines in the counting journal if the on-hand inventory is equal to or below the minimum specified.