From the , click > .

Use this form to define settings that determine what information to display in the Gantt chart and how to display the information.

Navigating the form

The following tables provide descriptions for the controls in this form.

Tabs

Tab

Description

Define the general settings for the Gantt chart.

Define the settings for production orders.

Define the settings for planned production orders.

Define the settings for project activities.

Buttons

Button

Description

Apply changes without closing the form.

Fields

Field

Description

Select this check box to use the calendar that is defined for the work center.

Note Note

You can reschedule a job in a chart by using the drag-and-drop method only when the calendar is loaded.


Select this check box to display the nonworking time interval as a thin line instead of a full bar. If the check box is clear, the working times and nonworking times are displayed as a full bar.

Select this check box to make the , , and fields available to edit. These fields enable you to set the position of a Gantt chart in the form.

Select this check box to display all of the links between jobs in the chart. If the check box is clear, only the links for the selected orders are displayed.

Select this check box to display jobs that have an expected finish date and time that are later than the job's delivery date and time.

Select this check box to display production order data in a chart.

Select the check boxes for the job types that you want to display in a chart.

Note Note

Only the selected job types are loaded in a chart. Job types that are not selected are not included in manual rescheduling, and rescheduling may not pass validation.


Select the check boxes for the jobs that you want to display in a chart.

When you select this check box, a Gantt chart loads all of the data that is related to the order. This may result in the timescale interval exceeding the originally defined ending date.

Note Note

This check box is available when you use a work center Gantt chart or a Gantt chart.


Select this check box to display a completion bar for the operation in the chart. A completion bar displays the progress of an operation based on reported times compared with standard times.

Note Note

Because over-consumption and under-consumption can affect standard times, the completion bar is displayed as follows:


  • The completion bar displays the reported time compared to the scheduled time as long as the scheduled time is <=100%.

  • If the scheduled time is >100%, the completion bar does not exceed the job bar. This prevents the chart from becoming cluttered.

Select this check box to display planned production order data in the chart. This check box is selected by default when you open a Gantt chart from the form.

Select this check box to display project activities in the chart.