> > >
Use this form to view the scheduling processes that are either in process or have failed. This form is useful when analyzing system performance.
Note |
---|
As a scheduling process finishes successfully, it disappears from this list and appears in the form. |
Navigating the form
The following tables provide descriptions for the controls in this form.
Tabs
Tab |
Description |
---|---|
|
View a list of the scheduling processes that are either in process or have failed. |
|
View detailed information about the selected scheduling process. |
Buttons
Button |
Description |
---|---|
|
Opens the and forms. |
|
Stops the scheduling process. |
|
Deletes the selected process. |
Fields
Field |
Description |
---|---|
|
Select this check box to show scheduling processes for all companies. |
|
The identification number of the scheduling process. The number is assigned automatically. |
|
Indicates whether the process is master scheduling or forecast scheduling. |
|
The master scheduling method that is used. |
|
The unique identification of the scheduling plan. |
|
The scheduling date. This field is calculated based on the value that is entered in the field on the form. |
|
The status of the selected scheduling process. The options are: |
|
The level of the bill of material (BOM) that is being processed within the current scheduling status. For more information, see the field. |
|
The number of helpers that was entered in the field on the form. |
|
The actual number of helpers that was used. This number depends on the number of available batch threads among the batch servers. |