Use this form to set up templates to reflect normal working times in your company. This can be a 24 hour production sequence where the resources are machines, or a work week of 9 to 5 for the purchasing department, where the resources are individual employees. The templates will help you create and manage working time calendars for your work centers. Working time calendars use the work times you define in this template.
More on efficiency and properties
-
: You can specify an efficiency rate for each time period you set up. For example, if the evening shift operates at an efficiency level of 75 percent (versus the day shift, which operates at 90 percent), you can note this here. The effects of these rates are factored into the available capacity on the work centers, and throughout the system.
-
Properties: You can assign properties to your templates. Properties are used by work centers to help optimize production schedules and are set up in the Properties (form).
Navigating the form
The following tables provide descriptions for the controls in this form.
Tabs
Tab |
Description |
---|---|
View or define operation times and designate a name for the working time template you create. |
|
to |
Specify the normal or most used hours of operation in the tabs pertaining to each day of the week. For example, use the field to specify the time the work period begins, and the field the time the work period ends. Enter the efficiency percentage and property you want to use when scheduling and structuring productions. |
Buttons
Button |
Description |
---|---|
|
Copy one template to another to reuse working times. |
|
Copy one day to another to reuse working times. |
Fields
Field |
Description |
||
---|---|---|---|
|
The operation times can be the day shift, evening shift, or night shift. |
||
|
Create a name for the current working time template. The name will appear in list boxes used to select working time templates. |
||
|
Select if pickup not possible. |
||
|
Specify the time for the current weekday. |
||
|
Specify the time for the current weekday. |
||
|
Specify the efficiency percentage to be used in scheduling for the period in question, where: Scheduling time = Time * 100/Efficiency percentage.
|
||
|
Properties are used in the scheduling and structuring of production. The idea is that productions sharing the same properties can be produced simultaneously. For more information, see Working time templates (form). |
||
|
Select if pickup is not possible |
||
|
Select if pickup is not possible |
||
|
Select if pickup is not possible |
||
|
Select if pickup is not possible |
||
|
Select if pickup is not possible |
||
|
Select if pickup is not possible |