> Common Forms> > >
Use this form to define detailed coverage settings for the current item and the inventory dimensions that are selected for coverage planning. The program uses item coverage settings to calculate requirements for the item and its coverage-planned dimensions during master scheduling.
When you create item coverage records for dimensions, you must follow the dimensions hierarchy that is defined. The hierarchy is as follows:
-
Site
-
Configuration
-
Size
-
Color
-
Warehouse
-
Location
For example, if an item is coverage planned for site, configuration, and size, you must first define the coverage settings for the site before you can define the coverage settings for the configuration.
You cannot create item coverage records that contain the following dimensions, regardless of whether they are selected for coverage planning:
-
Pallet
-
Serial number
-
Batch number
Tasks that use this form
Navigating the form
The following tables provide descriptions for the controls in this form.
Tabs
Tab |
Description |
---|---|
View existing basic coverage parameters for the item. |
|
Enter detailed coverage parameters for the item. |
|
|
Enter lead time information for the item. |
|
View minimum and maximum key information that has been set up for the item. |
|
View the current inventory dimensions for the item. This may be useful if the form contains invalid coverage records. |
Buttons
Button |
Description |
---|---|
|
Open the , which can guide you through creating new coverage settings or deleting invalid coverage settings for the current item and the inventory dimensions that are selected for coverage planning. |
|
Open another form to view a list of the existing default item coverage records for the current item dimension combination. The records in the list are sorted, with the dimension combinations becoming less specific as you move down the list. Each time you use the button, the record that contains the next least specific dimension combination is selected. Example You create an item coverage record for three dimensions: site; color; and warehouse. To view the default settings for the dimension combination, use the button to open another form. If there is an existing record that contains site and color, it is selected. If there is no record for site and color, the record for site is selected. If there is no record for site, then no record is selected. |
Fields
Field |
Description |
||
---|---|---|---|
|
When the multisite functionality is activated, this field appears on the and the tabs. |
||
|
When you select this check box, you can determine the planned order type that is generated to cover a requirement during master scheduling. You can select the planned order type, but there are some restrictions that are based on the item type. You use this field together with the field. |
||
|
Indicates the planned order type that master scheduling creates using the current coverage settings for the item dimension. When you select the check box, you can change the value in field. The planned order types are:
|
||
|
When you select this check box, the and fields become available so that you can edit them. If you do not select this check box, the and fields are not available to edit, and they contain the existing default values. Master scheduling uses these default values to calculate requirements. For more information on the default settings, see the description for the button. |
||
|
When you select this check box, the coverage group settings for the selected coverage group become available so that you can edit them. If you do not select this check box, the coverage group settings are not available to edit, and the fields contain the existing default values. Master scheduling uses these default values to calculate requirements. For more information on the default settings, see the description for the button. |
||
|
Enter the minimum inventory quantity (the safety stock level) that you want to maintain for the item, stated in inventory units. When projected available inventory falls below this quantity, master scheduling generates a planned order to bring inventory up to the specified minimum quantity after any other open requirements are fulfilled. If you leave the field blank, the default value is zero. This field is used when you select , , or in the list.
|
||
|
Enter the maximum inventory quantity that you want to maintain for the item, stated in inventory units. When projected available inventory falls below the minimum quantity, master scheduling generates a planned order to bring inventory up to the specified maximum quantity after any other open requirements are fulfilled. This field is available when you select in the list. Example The minimum quantity is 10, and the maximum quantity is 15. Current on-hand inventory is 4. This gives a minimum quantity requirement of 6. However, since the maximum quantity is 15, master scheduling generates a planned order for 11.
|
||
|
The identification of the coverage group. You can select a different coverage group for the item, for example if the default coverage group in the master planning parameters is unsuitable. |
||
|
Select the method that master scheduling uses to calculate requirements for the item. The options are:
|
||
|
Enter a time period, in number of days, during which master scheduling consolidates all requirements for the item and generates one planned order to cover the sum of these demands. If you enter 5, for example, planned orders are consolidated for 5-day periods. The coverage period begins on the date of the first requirement, and the planned order is generated on this date. The requirement date (for example, the delivery date) determines which period the planned order is placed in. The field is available when you select in the list. Example The coverage period is 5 and the minimum quantity is 0. There are sales orders with requirement dates of 9/1, 9/3, 9/10, 9/14, and 9/20. Master scheduling generates three planned orders:
|
||
|
Enter the time period, in number of days from today's date, during which requirements are calculated.
|
||
|
Enter a number of days that are added to a requirement due date to define a time interval during which a planned receipt that is due can be used to fulfill the requirement. A planned receipt that is due outside of the defined time interval is not valid to fulfill the requirement, and master scheduling generates a new planned order. You can equate negative days with the number of past-due delivery days (during which there is a negative inventory level for the item) that you accept before you create a new fulfillment order. You can specify negative days in the form or the form. Example For a particular item, a purchase order is scheduled for receipt on the 20th of the month, and a sales order is scheduled for delivery on the 19th of the same month. Should master scheduling generate a new planned purchase order to cover the requirement, or do you accept a late sales order delivery on the 20th? If you set the negative days to zero, a new planned purchase order is generated. If you set the negative days to a number greater than zero, no planned purchase order is generated. Instead, an action message is generated for the purchase order, and a futures message is generated for the sales order. For additional information, see About action messagesand About futures messages. |
||
|
Enter a number of days that are subtracted from a requirement due date to define a time interval during which a planned receipt that is due can be used to fulfill the requirement. A planned receipt that is due outside of the defined time interval is not valid to fulfill the requirement, and master scheduling generates a new planned order. You can equate positive days with the number of days that you use existing inventory (during which there is a positive inventory level for the item) before you create a new fulfillment order. You can specify positive days in the form or the form. Example For a particular item, inventory exists and a sales order is scheduled for delivery in 90 days. Should master scheduling generate a new planned purchase order to cover the requirement, or is the order fulfilled from the current inventory? If positive days are less than 90, a new planned purchase order is generated. If positive days are greater than 90, no planned purchase order is generated. However, current inventory levels of the item are no longer available for new sales orders.
|
||
|
Select a main warehouse from which to restock your current warehouse. To activate this field, select the option in the field. |
||
|
If minimum on-hand stock fluctuates seasonally, you can specify a minimum key to adjust the minimum inventory level accordingly. View the results on the tab. |
||
|
If maximum on-hand stock fluctuates seasonally, you can specify a maximum key to adjust the maximum inventory level accordingly. View the results on the tab. |
||
|
Select the date or the time frame for which the inventory level must meet the quantity specified in the field. This list is used when you select in the list. Master scheduling calculates net requirements (in this order of priority: sales orders, production orders, transfer orders, minimum quantity) and generates planned orders accordingly. The options are:
|
||
|
Select this check box to fulfill the minimum inventory level for all the periods that are set up for the minimum key. If the check box is cleared, minimum inventory is fulfilled for the relevant period. |
||
|
Select this check box to override the default purchase lead time for the coverage dimension on the item. For more information, see About planned purchase order lead times. |
||
|
Select this check box to override the default production lead time for the coverage dimension on the item. This option is used when an item has no associated route. |
||
|
Select this check box to override the default transfer lead time on the warehouse associated with the item. |
||
|
Specify the lead time for purchases in days. This field is available when you select the check box. |
||
|
Specify the lead time for production in days. This field is available when you select the check box. |
||
|
Specify the lead time for transfers in days. This field is available when you select the check box. |
||
|
Select this check box to count planned purchase order lead times in workdays. Workdays are open days in a current calendar. For planned purchase orders, master scheduling uses a calendar based on this priority sequence:
|
||
|
Select this check box to count planned production order lead times in workdays. For planned production orders, master scheduling uses a calendar based on this priority sequence:
|
||
|
Select this check box to count planned transfer order lead times in workdays. For planned transfer orders, master scheduling uses a calendar based on this priority sequence:
|
||
|
Specify the factor by which the minimum inventory is multiplied in the current period. Example The specified minimum quantity is 10. During September you apply a minimum key with a factor of 0.50. The revised minimum inventory is calculated as 5. A factor of 2.00 gives a minimum inventory of 20. A factor of 0.00 gives a minimum inventory of 0.00. |