Use this form to check or reserve capacity on the particular Work center or Work center group selected. Capacity is the percentage of company resources available for production. Scheduling is possible in different versions.
More on reservations on different load types
Reservations can be made on the following load types:
-
- Reservations made based on a production order with the status Operations scheduled or on Operation scheduled production orders that are subsequently started.
-
- Reservations made based on production orders with the status Job scheduled or a Job scheduled production order that are subsequently started.
-
- Used when scheduling has been aborted in which case you can return to the starting point.
Navigating the form
The following tables provide descriptions for the controls in this form.
Tabs
Tab |
Description |
---|---|
View reservations on the capacity of the work center or group selected. You can see the date the reservation was made and other important overall information, including reference, number, type, and times reserved. |
|
|
|
|
|
Fields
Field |
Description |
---|---|
|
Work center reservation date. |
|
The following reference types exist:
|
|
Number of the reference that created the reservation. |
|
This field shows the load type. The following options exist:
|
|
Identification of the work center. |
|
The starting time can either be the expected starting time of production orders with the status Job scheduled or the starting time for available capacity. The value of reservations with the load type Operations scheduled or the reference type Planned order is 0. Therefore, for operations scheduled production orders and planned production orders that are not yet firm, you are only able to read the reservation in hours. |
|
The end time can either be the expected ending time of a production order with the status Job scheduled or the ending time for available capacity. The value of reservations with the load type Operations scheduled or the reference type Planned order is 0. Therefore, for operations scheduled production orders and planned production orders that are not yet firm, you are only able to read the reservation in hours. Consequently, the time for execution of the production is not established. |
|
If the reservation was made based on master scheduling, then the requirement version that reserved the capacity is shown here. You can work with several scheduling versions, which allows you to compare them. |
|
Identification of the work center group. |
|
This field shows the load type. The following options exist:
|
|
Load shows the percentage of the maximum capacity reserved. This percentage depends on the field in the working-time calendar, the field for the work center, and the field for the production route. |
|
Scheduled or reserved property. |
|
Seconds that are either reserved or available. |
|
By selecting Lockedyou are no longer able to reschedule or change the reservation. This function can be used for rush jobs or other important productions that need to be finished on time. This way you ensure that the production is not rescheduled. You can lock productions in the Production table. For more information about locking productions, see . |
|
Operation number in the production route that has reserved the capacity. |
|
Job number type shows the job type that reserved the capacity. The job type is specified in the production route and is a part of the operation. The following job types exist: For more information, see the field in the Monitor production jobs (form)dialog. |
|
Priority of operations that reserved the work center. Prioritization is used for simultaneous operations. If you are not working with simultaneous operations, then the operation's priority is always primary. The operation can have one of the following priorities: You set up the priority in the production route. For more information about prioritization, see the field in the Route operations on route version (form)dialog. |
|
Scheduling job that reserved the capacity. |
Buttons
Button |
Description |
---|---|
|
Show requirement transactions in other plans. |