> > > >
Use this report to prepare a list of the employees and projects included in validation groups.
The report can be printed with two different perspectives:
Tasks that use this report
Navigating the report
The following links and tables provide descriptions for the controls in this report.
Enter criteria on the General tab
Prepare batch processing on the Batch tab
Button
Button |
Description |
---|---|
|
Open a query and select the data to be included. |
|
Return to the default settings of the query. |
|
Set up report delivery, such as formatting for a printer, printing, or saving as a file. |
|
Change the starting time and starting date of the batch job or set up a recurring batch job. |
Fields
Field |
Description |
---|---|
|
Select this checkbox to include the time-and-material projects in the report. |
|
Select this checkbox to include fixed-price projects in the report. |
|
Select this checkbox to include investment projects in the report. |
|
Select this checkbox to include internal and cost projects in the report. |
|
Select this checkbox to include time projects in the report. |
|
Select the layout for the report. |
Note |
---|
If no options in the section are selected, all project types will be included in the report. |